New Living Translation

2 Chronicles 3:1-4 New Living Translation (NLT)

1. So Solomon began to build the Temple of the lord in Jerusalem on Mount Moriah, where the lord had appeared to David, his father. The Temple was built on the threshing floor of Araunah the Jebusite, the site that David had selected.

2. The construction began in midspring, during the fourth year of Solomon’s reign.

3. These are the dimensions Solomon used for the foundation of the Temple of God (using the old standard of measurement). It was 90 feet long and 30 feet wide.

4. The entry room at the front of the Temple was 30 feet wide, running across the entire width of the Temple, and 30 feet high. He overlaid the inside with pure gold.